在橋梁建造上的應(yīng)用案例
Application of bridge construction
通過(guò)使用Siegmund的基礎(chǔ)軌道、焊接工作臺(tái)和連接框架,能夠達(dá)到最小的公差承受最大的負(fù)載,同時(shí)能在長(zhǎng)度達(dá)到53米、重量超過(guò)70頓的過(guò)街天橋制作時(shí)達(dá)到毫米級(jí)的精準(zhǔn)度。
By using Siegmund s basic rails, welded workbenches and connecting f rames, the smallest tolerances are minimized to withstand the maximum load and can reach millimeter-level accuracy at a length of up to 53 meters and over 70 square feet of footbridge.
在鈑金制造上的應(yīng)用案例
In the sheet metal manufacturing on the application case
Siegmund的焊接工作臺(tái)表面經(jīng)過(guò)等離子滲碳處理后,可使工件不粘結(jié)飛濺的焊渣。經(jīng)過(guò)多年使用,依然可保持這一優(yōu)勢(shì)。
Siegmund s welding table surface after plasma carburizing treatment, the workpiece can not stick splash of welding slag. After years of use, still can maintain this advantage.
【此文章原創(chuàng)來(lái)自于158機(jī)床網(wǎng)轉(zhuǎn)載請(qǐng)注明出處】